Belarus 1025/1025.2/1025.3
Section D. Controls and instruments
D6
Precise total time of engine
operation 1 )
Т
Programming mode (access
only from control panel)
Transfer coefficients 2)
К
Radius of rear wheel rolling
R
Number of gear teeth 3)
Z
1 ) Access only for review. 2) Number of parameters in group – four:
К
1,
К
2,
К
3,
К
4 (see table 2). 3) Number of parameters in group - two: Z1, Z2 (see table 3)
When power is supplied the
indicator is transferred to main operation
mode. When there are no signals from
speed sensors, digital indicator receives
displays meter of total engine operation
time, and light-emitting diode close by
symbol “h” goes alight. Indication of
information on engine crankshaft
rotation speed and PTO rotation speed
depends on signal from phase generator
winding (and signal from PTO rotation
sensor, if available).
Total time of engine operation
Appearance on the indicator input of
pulses from speed sensors leads to
transfer to movement speed indication
mode and measured rated value is
supplied to digital indicator and a LED at
“km/h” is on.
Design speed (km/h)
The design speed is greater than real
speed as tractor slippage is not taken
into account Speed is indicated upon
signal from sensor installed on the final
gear pinion of the wheel rotating at lower
speed. When one of signals is missing
speed value will not be indicated.
Speed sensor operation when a signal
from one of them is missing:
а
) when there is no signal from the right
wheel speed sensor, in 12 seconds after
start of movement on the right side of
the digital indicator symbol “I” is
displayed;
b) when there is no signal from the left
wheel speed sensor, in 12 seconds after
start of movement on the left side of the
digital indicator symbol “f” is displayed.
Control panel for IK programming
To pass over to programmed
parameters and specified engine
operation time, control panel with two
push buttons is used.
Fig 2
Summary of Contents for 1025 2008
Page 205: ......