Programming manual SCU-series
HB-37500-820-10-12F-EN SCU Programming manual
Page 75 of 252
Status: 19.03.2021
Furthrmore, the barriers
only clear the way (via the Slave outputs)in the best-case scenario
The data transfer between Master and Slaves is effected via FSoE.
FSoE
—
network plan:
Figure 50: FSoE-Plan
FSoE-Master
SCU-1-EC
FSoE-Adr.: 0
FSoE-ID: 0
EtherCAT-ID: 6
Master in switch
cupboard hall 12:
Monitoring of the end
position, with Start,
emergency-stop, reset
(emergency-
stop) …
FSoE-Slave
SDU-11
(1 axis + 5 I + 4 O)
FSoE-Adr.: 1
FSoE-ID: 1
FSoE-Slave
SIO-11
(6 I + 2 O)
FSoE-Adr.: 2
FSoE-ID: 2
EtherCAT
To the central computer
FSoE GATE monitoring
FSoE-Slave
SIO-11
(3 I + 2 O)
FSoE-Adr.: 3
FSoE-ID: 3
Slave in switch
cabinet hall 15
(neighbouring hall)
–
Automatic GATE
Access clear?
1 switch, 2
Emergency-Stop
Barrier release
Slave in switch
cabinet 1 hall 13
–
automatic GATE
control:
Gate position (
simple
SINCOS), Start
button, light curtaing,
1 Emergency-Stop
barrier release
Slave in switch
cabinet 4 hall 13
–
back of GATE
Exit clear??
2switches,, 4
Emergency-Stop,
switch for barrier
FSoE-Slave
SDC (LT-i)
(3 I + 2 O)
EC-Adr.: 4
EC-ID: 4
Slave at central
barrier (access to
entrance)
–
central
barrier:
General release?
3 switches
Barrier release