
FRU Installation
114
AXP1440 Installation and Use (6806800H23U
)
2. Insert blade into the shelf by placing the top and bottom edges of the blade in the card
guides of the shelf. Ensure that the guiding module of shelf and blade are aligned
properly.
3. Apply equal and steady pressure to the blade to carefully slide the blade into the shelf
until you feel resistance. Continue to gently push the blade until the blade connectors
engage.
4. Squeeze the lever and the latch together and hook the lower and the upper handle
into the shelf rail recesses.
5. Fully insert the blade and lock it to the shelf by squeezing the lever and the latch
together and turning the handles towards the face plate.
If your shelf is powered, as soon as the blade is connected to the backplane
power pins, the blue LED is illuminated.
When the blade is completely installed, the blue LED starts to blink. This
Summary of Contents for AXP1440
Page 1: ...AXP1440 Installation and Use P N 6806800H23U October 2018...
Page 8: ...6 AXP1440 Installation and Use 6806800H23U Contents...
Page 10: ...List of Figures 8 AXP1440 Installation and Use 6806800H23U...
Page 12: ...List of Tables 10 AXP1440 Installation and Use 6806800H23U...
Page 20: ...AXP1440 Installation and Use 6806800H23U About this Manual 18 About this Manual...
Page 79: ...Site Preparation AXP1440 Installation and Use 6806800H23U 77 Figure 3 4 Planning Checklist 2...
Page 80: ...Site Preparation 78 AXP1440 Installation and Use 6806800H23U...
Page 108: ...AXP1440 Shelf Installation 106 AXP1440 Installation and Use 6806800H23U...
Page 152: ...Shelf Management Alarm Module 150 AXP1440 Installation and Use 6806800H23U...
Page 155: ...1...