![Amazone AD 3000 Super Classic Line Operating Manual Download Page 165](http://html1.mh-extra.com/html/amazone/ad-3000-super-classic-line/ad-3000-super-classic-line_operating-manual_2919699165.webp)
Use of the implement
AD 3000 Super BAH0107-0 02.20
165
10.1
Initial operation
Before initial commissioning
Check the hydraulic hose lines and couplings.
Section 12.5.2
Page 189
Check all the components of the hydraulic system for leaks
Check the oil level, in the Vario gearbox
Section 12.7
Page 191
After the first 10 operating hours
Check the hydraulic hose lines and couplings.
Section 12.5.2
Page 189
Check all the components of the hydraulic system for leaks
Check all bolted connections for tight fit
Section 12.10
Page 195
10.2
Moving the implement from transport into working position
1. Put down the seeding combination at the beginning of the field and align it straight.
2. Move the road safety bar of the exact following harrow to the parking position ........... Page 158
3. Move the exact following harrow into working position ................................................. Page 146
4. Move the star wheel into working position .................................................................... Page 124
5. Move the tramline marker into working position ............................................................ Page 156
6. Check all implement settings .......................................................................................... Page 11
7. Instruct any people
in the area to stand at a minimum distance of 20 m from the implement
8. Release the transport lock for the track markers
see "Soil tillage implement" operating manual.
9. Switch on the control terminal, see "Control terminal" operating manual.
10. Actuate the tractor control unit (yellow):
Lower the active track marker
Advance the tramline control
Creation of tramlines (if required)
Lowering the tramline marker (if necessary).
11. Set the tramline counter just before commencing the first field run
refer to the "Control terminal" operating manual.
12. Run the PTO shaft of the soil tillage implement up to operating speed
see "Soil tillage implement" operating manual.
13. Start off and lower the combination using the tractor's three-point hydraulic system.
14. Calibrate the seed rate after approx. 2 ha.
Summary of Contents for AD 3000 Super Classic Line
Page 2: ......
Page 9: ...AD 3000 Super BAH0107 0 02 20 9 ...
Page 77: ...Structure and function AD 3000 Super BAH0107 0 02 20 77 Fig 72 ...
Page 196: ......
Page 197: ......