
MEA-100B
7. Basic Operation
7-10
5-Schedule Input from External
To select 5-schedule input, set SS on the SET2 #1 screen to 2. (See 9. (2)
.)
If no schedule is input (all the signal circuits are opened), the
MEA-100B
operates with schedule #1.
If the schedules are input under 2 or more numbers at a time, the schedule
under the lower SCHEDULE number is used.
Schedule No. #
SCH.1
SCH.2
SCH.4
SCH.8
SCH.16
1
1
2
4
8
16
31-Schedule Input from Panel Operation
Display the Welding Schedule Setting screen, the Current Monitor Display
screen or the Current Monitor Range Setting screen and then input the schedule
number you use directly.
(6) Welding Start
When the start signal is input to the I/O terminal strip, the [START] lamp lights and
the welding sequence starts.
During the welding sequence, the operation currently underway is indicated by an
arrow as shown below.
The screen is displayed as
shown at left when W1 is
underway.
SCHEDULE NO.
CURR.1
CURR.2
PULSATION
SOLENOID
UP2
→
DWN
W2
SQ UP1 W1
CO
HLD