![Amada 1000ADP Operation Manual Download Page 78](http://html1.mh-extra.com/html/amada/1000adp/1000adp_operation-manual_2915799078.webp)
APPENDIX B: ELECTRICAL AND DATA CONNECTIONS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
B-10
990-922
Operator Emergency Stop Cable Switch Input
Function
Connect an agency recognized, normally closed
Emergency Stop Switch
to the cable provided on the
rear panel. Use the switch during Power Supply operation as an
Emergency Stop Switch.
When operated
(opened), it will immediately halt the weld process and de-energize all ADP outputs
Connections
You
must
connect the
Emergency Stop Switch Cable
leads, otherwise the Power Supply will not
function. Connect an agency recognized, normally closed
Emergency Stop Switch
between conductors
of the 2-foot (61 cm) operator
Emergency Stop Switch
cable. When the switch is operated (opened), it
de-energizes all power outputs from the Power Supply. If you choose not use an
Emergency Stop
Switch,
an electrical short is required between cable leads for the Power Supply to be functional.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......