![Amada 1000ADP Operation Manual Download Page 57](http://html1.mh-extra.com/html/amada/1000adp/1000adp_operation-manual_2915799057.webp)
CHAPTER 4: OPERATING INSTRUCTIONS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
990-922
4-9
Extended Shut-down Procedure
If the ADP unit has been turned off and non-operational for a period of 3 months or longer, an extended
warm-up sequence is recommended.
1.
Turn the unit ON.
2.
Set the energy to the maximum level.
Example:
set the 1000ADP to 999 Watt Seconds.
3.
Fire the unit once.
4.
Leave the power ON and wait 15 minutes.
5.
Program the desired schedule and resume normal operation.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......