![Amada 1000ADP Operation Manual Download Page 44](http://html1.mh-extra.com/html/amada/1000adp/1000adp_operation-manual_2915799044.webp)
CHAPTER 3. USING DISPLAY SCREENS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
3-8
990-922
BAUD RATE
Press the
MENU
button again the highlight the
BAUD RATE
field. This is the speed used for
RS-232 communications.
DEBOUNCE
Press the
MENU
button again for the debounce
setting. Use the
0 MSEC
setting for applications
where a PLC communicates with the unit.
CHAINING START
Press the
MENU
button again to edit the starting
value for a weld chain.
In chaining, all schedules from
CHAINING
START
to
CHAINING END
are welded one time
and in numeric order. When the last schedule
in the chain is completed, the system returns to
the
CHAINING START
schedule.
Whenever a schedule within a chain is selected,
the chain will start at that schedule. When the
last schedule in the chain is completed, the
system returns to the
CHAINING START
schedule.
NOTE:
If the schedules that are chained together differ in pulse widths or polarities, a delay of 50 to
350 msec may be required between schedules to switch to the new settings.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......