![Amada 1000ADP Operation Manual Download Page 50](http://html1.mh-extra.com/html/amada/1000adp/1000adp_operation-manual_2915799050.webp)
CHAPTER 4: OPERATING INSTRUCTIONS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
4-2
990-922
Initial Setup
1.
Set the
WELD/NO WELD
switch on the Power Supply front panel to the
NO WELD
position. In
this position, the Unit will operate the weld head
without
producing weld current.
2.
Set the ON / OFF switch on the rear panel of the Power Supply to the ON position.
3.
Adjust the weld head force adjustment knob for a force appropriate for your welding
application. A good starting point is the mid-point in the range of the weld head force.
4.
Press the foot switch to activate the first level switch and clamp the material. Check the head
for suitable clamping pressure. Release the footswitch to release the material. Check the head
for smooth operation of the electrodes.
5.
When you are ready to perform a weld, be sure to set the
WELD/NO WELD
switch back to the
WELD
position.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......