CHAPTER 2: INSTALLATION AND SETUP
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
2-6
990-922
Foot Pedal-Actuated Weld Head
1.
Adjust the weld head force adjustment knob to produce
5
units of force, as displayed on the
force indicator index.
2.
Connect the weld head firing switch cable connector to the Power Supply firing switch cable
connector.
3.
Connect a normally closed, agency compliant,
EMERGENCY STOP SWITCH
across the two
leads of the emergency stop switch connector cable. This switch, when operated (open), will
immediately stop the weld cycle and retract the weld head. See
Appendix B. Electrical and
Data Connections
for circuit details.
4.
Set the
ON/OFF
switch on the rear panel of the Power Supply to the
ON
position.
5.
Set the active schedule to the minimum energy level of the Power supply.
6.
Set the weldhead force to 5 or greater.
7.
Smoothly close the weldhead. Verify that the power supply fires.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......