![Amada 1000ADP Operation Manual Download Page 72](http://html1.mh-extra.com/html/amada/1000adp/1000adp_operation-manual_2915799072.webp)
APPENDIX B: ELECTRICAL AND DATA CONNECTIONS
125ADP/300ADP/1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY
B-4
990-922
Configuration for J6 and J7 Low = True Inputs
(Switch Closure to Activate Inputs – Default Configuration)
CAUTION
Damage may result from improper connection of these pins. The optical firing switch is
intended for use
only
on Miyachi Unitek heads with this feature. In operation, an optical
switch connects pin 3 to pin 20 to initiate firing. Neither of these pins should be used for
any other purpose since they connect to internal, non-isolated points in the unit.
Summary of Contents for 1000ADP
Page 1: ...990 922 Rev G STORED ENERGY POWER SUPPLY 125 300 1000ADP OPERATION MANUAL...
Page 8: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY viii 990 922...
Page 9: ...125ADP 300ADP 1000ADP DUAL PULSE RESISTANCE WELDING POWER SUPPLY 990 922 ix...
Page 14: ......
Page 24: ......
Page 58: ......
Page 64: ......
Page 82: ......
Page 92: ......