
MAINTENANCE
TRAXX RF 04/14
Maintenance Section 5-23
© 2014 Alamo Group Inc.
MAINTENANCE
2. Re-tighten the 27mm grease plug nut and use
the special grease gun to pressurize the track
tensioning cylinder. The gauge on the grease
gun should read 1850 psi.
Note: The 1850 psi pertains ONLY to the Track
Tension.
Proper maintenance of the tracks will ensure a long and trouble free service life.
•
Check the tracks daily for loose spikes or cleats.
•
Check the Drive and Driven Sprockets daily for wear.
•
Check the undercarriage system every 4 hours for mud, sticks, rocks or other debris.
•
Check the track tension pressure as follows:
Every 5 hours of operation of the first 25 hours after installation or with a new machine.
After the first 25 hours check every 40 hours of operation
Track Tension Kit
A grease tensioner system controls the track
tension on the machine. Failure to observe the
correct tension can result in loss of the tracks
during operation.
A Tension Kit, consisting of a grease pump
equipped with a pressure gauge, is included with
your machine and should be used to correctly
check and set the pressure. The maximum
pressure setting is 1850 psi.
Wear Limits
The track components shown must be replaced when they reach their maximum wear limit.
Lubricating of Undercarriage Components
Components of the tracks undercarriage utilize sealed bearings which are not greaseable.
Summary of Contents for Traxx RF
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2014 Alamo Group Inc SAFETY SECTION...
Page 27: ...SAFETY TRAXX RF 05 14 Safety Section 1 17 2014 Alamo Group Inc SAFETY Decal Description...
Page 28: ...SAFETY TRAXX RF 05 14 Safety Section 1 18 2014 Alamo Group Inc SAFETY...
Page 29: ...SAFETY TRAXX RF 05 14 Safety Section 1 19 2014 Alamo Group Inc SAFETY...
Page 30: ...SAFETY TRAXX RF 05 14 Safety Section 1 20 2014 Alamo Group Inc SAFETY...
Page 31: ...SAFETY TRAXX RF 05 14 Safety Section 1 21 2014 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TRAXX RF 05 14 Safety Section 1 22 2014 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TRAXX RF 05 14 Safety Section 1 23 2014 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TRAXX RF 05 14 Safety Section 1 24 2014 Alamo Group Inc SAFETY...
Page 36: ......
Page 37: ......
Page 63: ......
Page 89: ...Introduction Section 2 1 2014 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2014 Alamo Group Inc ASSEMBLY SECTION...
Page 106: ......
Page 107: ...Operation Section 4 1 2014 Alamo Group Inc OPERATION SECTION...
Page 145: ...Maintenance Section 5 1 2014 Alamo Group Inc MAINTENANCE SECTION...
Page 183: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 24 2014 Alamo Group Inc SEGURIDAD...
Page 184: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 23 2014 Alamo Group Inc SEGURIDAD...
Page 185: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 22 2014 Alamo Group Inc SEGURIDAD...
Page 186: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 21 2014 Alamo Group Inc SEGURIDAD...
Page 187: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 20 2014 Alamo Group Inc SEGURIDAD...
Page 188: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 19 2014 Alamo Group Inc SEGURIDAD...
Page 189: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 18 2014 Alamo Group Inc SEGURIDAD...
Page 190: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 17 2014 Alamo Group Inc SEGURIDAD...
Page 191: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 16 2014 Alamo Group Inc SEGURIDAD...
Page 192: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 15 2014 Alamo Group Inc SEGURIDAD...
Page 206: ...Secci n de Seguridad 1 1 2014 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 207: ......