
MAINTENANCE
TRAXX RF 04/14
Maintenance Section 5-19
© 2014 Alamo Group Inc.
MAINTENANCE
Replacing Tracks
Tracks must be changed when only 1/2” (10mm) of tread remains, or before if they show signs or excessive
cuts or cracks.
The components shown below are parts of the track system illustrated here for identification purposes. The
procedure for changing the tracks is as follows;
Never attempt to work on any machine that is not safely supported and chocked using
suitable equipment specifically designed for the task and capable of supporting its weight.
Ensure suitable safety gear is worn at all times when performing maintenance tasks.
Beware, there is a “Pinch Risk” when working on these components.
1.
Replacing the tracks requires that the machine
be elevated and retained on a stable platform.
A forklift or an overhead hoist of 2 tons or more
capacity could be used to raise the mower.
Tracked Undercarriage
Lower Roller Unit
Sprocket Assembly
Idler Roller
Backstay
Rubber Track
Summary of Contents for Traxx RF
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2014 Alamo Group Inc SAFETY SECTION...
Page 27: ...SAFETY TRAXX RF 05 14 Safety Section 1 17 2014 Alamo Group Inc SAFETY Decal Description...
Page 28: ...SAFETY TRAXX RF 05 14 Safety Section 1 18 2014 Alamo Group Inc SAFETY...
Page 29: ...SAFETY TRAXX RF 05 14 Safety Section 1 19 2014 Alamo Group Inc SAFETY...
Page 30: ...SAFETY TRAXX RF 05 14 Safety Section 1 20 2014 Alamo Group Inc SAFETY...
Page 31: ...SAFETY TRAXX RF 05 14 Safety Section 1 21 2014 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TRAXX RF 05 14 Safety Section 1 22 2014 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TRAXX RF 05 14 Safety Section 1 23 2014 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TRAXX RF 05 14 Safety Section 1 24 2014 Alamo Group Inc SAFETY...
Page 36: ......
Page 37: ......
Page 63: ......
Page 89: ...Introduction Section 2 1 2014 Alamo Group Inc INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 2014 Alamo Group Inc ASSEMBLY SECTION...
Page 106: ......
Page 107: ...Operation Section 4 1 2014 Alamo Group Inc OPERATION SECTION...
Page 145: ...Maintenance Section 5 1 2014 Alamo Group Inc MAINTENANCE SECTION...
Page 183: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 24 2014 Alamo Group Inc SEGURIDAD...
Page 184: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 23 2014 Alamo Group Inc SEGURIDAD...
Page 185: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 22 2014 Alamo Group Inc SEGURIDAD...
Page 186: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 21 2014 Alamo Group Inc SEGURIDAD...
Page 187: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 20 2014 Alamo Group Inc SEGURIDAD...
Page 188: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 19 2014 Alamo Group Inc SEGURIDAD...
Page 189: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 18 2014 Alamo Group Inc SEGURIDAD...
Page 190: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 17 2014 Alamo Group Inc SEGURIDAD...
Page 191: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 16 2014 Alamo Group Inc SEGURIDAD...
Page 192: ...SEGURIDAD TRAXX RF 04 14 Secci n de Seguridad 1 15 2014 Alamo Group Inc SEGURIDAD...
Page 206: ...Secci n de Seguridad 1 1 2014 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 207: ......