
Agilent 1290 Infinity LC System Manual and Quick Reference
73
System Setup and Installation
4
Installing the Module
Installing the Module
For details of installation procedures for the modules, refer to the individual
module manuals. These manuals also contain information on specifications,
maintenance and parts.
Optimizing the Stack Configuration (Binary LC System)
One Stack Configuration
Ensure optimum performance by installing the modules of the Agilent 1290
Infinity Binary LC System in the following configuration (See
on page 75). This configuration optimizes the flow path
for minimum delay volume and minimizes the bench space required.
The Agilent 1290 Infinity Binary Pump should always be installed at the
bottom of the stack.