Operation
67/ 84
Fresh grease separator plant Lipator-S-RA/Lipator-P-RA
EN
4.2.4 Automatic operating processes
Operating processes adjustable by the operator company:
■
„Grease draw-off“ start time triggers the following operating processes: 1 h heating and
then grease draw-off.
■
„Sludge draw-off“ start time triggers the following operating process: Sludge draw-off.
Unadjustable operating processes (ACO Service only):
■
if there is grease on the grease probe (regardless of the time): 1 h heating and then
grease draw-off.
■
The solenoid valve of the filling device opens simultaneously with the grease and sludge
draw-off and closes automatically 30 s after the end of draw-off (draw-off volume is
topped up again with freshwater).
■
Agitating device is running and alternates: 2 h on/1 h off
4.2.5 Factory settings values
Nominal size,
Chap. 2.4 „Product identification (nameplate)“.
Nominal
size
Grease draw-off
start time
Sludge draw-off
start time
Grease draw-off
solenoid valve
open period
Sludge draw-off
solenoid valve
open period
Heating rod
heating period
First fill filling
time
[h]
[h]
[s]
[s]
[s]
[s]
Lipator-S-RA
2
13:00
15:00
4
4
3,600
440
4
13:00
15:00
4
4
3,600
960
10
13:00
15:00
4
4
3,600
2,800
20
13:00
15:00
4
4
3,600
4,040
25
13:00
15:00
4
4
3,600
4,520
Lipator-P-RA
4
13:00
15:00
4
4
3,600
1,140
10
13:00
15:00
4
4
3,600
3,140
20
13:00
15:00
4
4
3,600
4,500
25
13:00
15:00
4
4
3,600
5,000