Appendix: Commissioning report
83/ 84
Fresh grease separator plant Lipator-S-RA/Lipator-P-RA
EN
Checklist for commissioning (properly qualified technician)
Tests & Inspections
(no claim is made that the list is complete)
OK
not
OK
Electrical fusing of the plant in accordance with the IEC regulations or national and local
regulations
Operating voltage and frequency
Rotational direction of agitating device motor
Agitating device: Functional test
Heating rod: Functional test
Grease probe: Functional test
Filling device: Functional test
Grease draw-off: Functional test
Sludge draw-off: Functional test
Compressor: Functional test
Setting of the set values in the control
Leaktightness: Barrels, fittings, pipes, connections
Fault signalling equipment: Fault displays, telecommunication equipment (group alarm)
Water trap in the separator
Instruction (by installer company)
Instruction
Remarks
yes
no
Instruction:
Functions, control, operating information, troubleshooting,
maintenance obligations
Handover:
Instructions for Use
Remarks:
Signature of properly qualified
technician:
Signature of authorised acceptance
inspection representative: