Operation
68/ 84
Fresh grease separator plant Lipator-S-RA/Lipator-P-RA
4.2.6 Operational adjustments
PLC (programmable logic) control
■
Grease draw-off solenoid valve open period, in „Grease ball valve time“ menu
■
Sludge draw-off solenoid valve open period, in „Sediment ball valve time“ menu
■
Heating rod heating period, in the „Heating time setting“ menu
■
First fill filling time in the „Basic fill time“ menu
Change procedure using the example of
"Grease draw-off solenoid valve open time":
■
Open the menus: Press button "A"
■
Select "Grease ball valve time": Arrow
button "+" or "-" and confirm with "OK"
button
■
Select "sec line" value: Arrow button "+"
or "-" and confirm with "OK" button (value
flashes)
■
Change value: Arrow button "+" or "-" and
confirm with "OK" button
■
Exit the menu: Press the "ESC" button
Timer
IMPORTANT
■
Channel A: Times for „Grease draw-off start time“
■
Channel B: Times for „Sludge draw-off start time“
■
Switching times are to be entered for each day of the week
■
Sludge draw-off should begin 2 hours after grease draw-off