Step 1 and Step 2: Attach the Correct Cables to the Devices
Connect the cables as illustrated in Figure 34 above.
Step 3: Configure the REL512 Communication Port
Configure the front port interface of the REL512 with the correct parameters. The default configuration for
the REL512 front port interface is:
8 Data Bits
No Parity
2Stop Bits
9600 Baud
Configure the front port with these parameters so that it may operate with a 10 bit modem as is used in
this example:
8 Data Bits
No Parity
1Stop Bit
19200 Baud
The procedure to configure the front port interface is as follows:
When connecting a device to the front port of the relay, the communication parameters for the port must
be changed to reflect those of the device to which it is connecting. To change the parameters via the
REL512 front panel interface one could follow the procedure as follows:
1.
From the screen of the Front Panel Interface viewing the meter readings, Depress the “E” key to get
the menu :
E
Fault Records
→
Device Info
←
Edit Settings
C
Metering
2.
Depress the Left Arrow Key “
←
” to Display the Menu
E
Edit Settings
→
Fault Records
←
View Settings
C
Metering
3.
Depress the “E” Key to display the menu
E
Password
********
C
Edit Settings
One must enter the CORRECT password to change the relay settings for this procedure. The default
password for the REL512 is “ABB” (without the quotation marks). If the password has been changed,
please enter the correct password as follows:
•
Depress the up arrow “
↑
” or down arrow “
↓
” to page through the numeric and alphabet
selections for the password.
•
Depress the left arrow “
←
” or the right arrow ”
→
” to move through the different positions of
the password.
Summary of Contents for REL 356
Page 23: ...ABB REL 356 Current Differential Protection 1 10 Product Overview and Specifications ...
Page 83: ...ABB REL 356 Current Differential Protection 3 36 Settings and Application ...
Page 127: ...ABB REL 356 Current Differential Protection 5 28 Testing ...
Page 186: ...LINE SECTIONALIZING USING A PLC AND ABB PROTECTIVE RELAY Page 49 of 53 ...
Page 187: ...LINE SECTIONALIZING USING A PLC AND ABB PROTECTIVE RELAY Page 50 of 53 ...
Page 188: ...LINE SECTIONALIZING USING A PLC AND ABB PROTECTIVE RELAY Page 51 of 53 ...
Page 189: ...LINE SECTIONALIZING USING A PLC AND ABB PROTECTIVE RELAY Page 52 of 53 ...