
Note
Action
xx2100001082
Removing the screws of the ball screw flange to
make enough space for removing the axis-4
second timing belt.
3
Removing the transmission module assembly
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
2
xx2100001091
Removing the screws of the transmission module
assembly.
3
Take out the transmission module assembly with
the axis-4-2 timing belt.
4
Continues on next page
Product manual - IRB 920
609
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.6.9 Replacing the axis-4 timing belt
Continued
Summary of Contents for IRB 920
Page 1: ...ROBOTICS Product manual IRB 920 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 984: ...This page is intentionally left blank ...
Page 1000: ...This page is intentionally left blank ...
Page 1002: ...This page is intentionally left blank ...
Page 1006: ......
Page 1007: ......