
3 Installation and commissioning
3.1 Introduction to installation and commissioning
General
This chapter contains assembly instructions and information for installing the IRB
920 at the working site.
See also the product manual for the robot controller.
The installation must be done by qualified installation personnel in accordance
with the safety requirements set forth in the applicable national and regional
standards and regulations.
Safety information
Before any installation work is commenced, all safety information must be observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any installation
work.
Note
Always connect the IRB 920 and the robot to protective earth and residual current
device (RCD) before connecting to power and starting any installation work.
For more information see:
•
Product manual - OmniCore C30
•
Product manual - OmniCore C90XT
•
Product manual - OmniCore E10
Product manual - IRB 920
51
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
3 Installation and commissioning
3.1 Introduction to installation and commissioning
Summary of Contents for IRB 920
Page 1: ...ROBOTICS Product manual IRB 920 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 984: ...This page is intentionally left blank ...
Page 1000: ...This page is intentionally left blank ...
Page 1002: ...This page is intentionally left blank ...
Page 1006: ......
Page 1007: ......