
Note
Action
xx1900001805
For robots with protection class IP54 (option 3350-
540)
Apply the glue to the upper contacted zone
between the shaft and the ball screw.
Note
Fulfill the gaps on the ball screw in this contacted
zone to make a sealing structure.
4
xx1900001615
For robots with protection class IP54 (option 3350-
540)
For robots with protection type Clean Room (op-
tion 3351-1)
Insert the O-ring to the shaft.
Note
Replace the o-ring if needed.
5
Refitting the lower bellow to outer arm
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
xx2100002409
For robots with protection class IP54 (option 3350-
540)
Apply the glue to the outer arm.
2
Continues on next page
Product manual - IRB 920
479
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.6.4 Replacing the pulley on the ball screw lower position
Continued
Summary of Contents for IRB 920
Page 1: ...ROBOTICS Product manual IRB 920 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 984: ...This page is intentionally left blank ...
Page 1000: ...This page is intentionally left blank ...
Page 1002: ...This page is intentionally left blank ...
Page 1006: ......
Page 1007: ......