![ABB IRB 6730 Product Manual Download Page 222](http://html1.mh-extra.com/html/abb/irb-6730/irb-6730_product-manual_3670664222.webp)
Note
Action
xx2200001466
Fit the retaining ring.
Tip
The bearing may need to be pushed in past
the retaining ring groove before the retain-
ing ring can be fitted.
5
xx2200001470
Hold a big screwdriver between the cradle
and the balancing device while securing
each screw in following step.
This is done to keep the distance between
the balancing device and the bearing while
tightening the screw.
6
Hex socket head cap screw: M16x70 12.9
Gleitmo 603+Geomet 500
Apply locking liquid on the screws, insert
them on both sides and tighten by hand.
7
Washer: 3HAC047681-001
The screws are not possible to torque
tighten at this point, since the front ear is
not fastened to the lower arm.
Locking liquid: Loctite 2400 (or equivalent
Loctite 243)
xx2200001475
Refitting the front shaft of the balancing device
Note
Action
Lifting shackle: SA-10-8-NA1
Apply the lifting accessory to the balancing device
(if not already done).
1
Lifting accessory (chain):
3HAC15556-1
Remove all residue of Loctite in the screw hole of
the shaft.
2
Continues on next page
222
Product manual - IRB 6730
3HAC085699-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.4.1 Replacing the balancing device
Continued
Summary of Contents for IRB 6730
Page 1: ...ROBOTICS Product manual IRB 6730 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 628: ...This page is intentionally left blank ...
Page 634: ...This page is intentionally left blank ...
Page 659: ......