Note
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
is sensitive to ESD on page 49
.
2
Torx pan head screw: M5x12
Stainless steel A2-70 (4 pcs)
Connect the battery cable and install the battery
pack into the SMB/battery recess.
Note
Make sure that the connector is assembled in the
correct direction according to its keying.
3
Tightening torque: 6 Nm.
xx2100002131
Secure the SMB battery cover with its attachment
screws.
4
See
.
Update the revolution counters.
5
DANGER
Make sure all safety requirements are met when
performing the first test run. See
installation, maintenance, or repair on page 96
6
Product manual - IRB 6730
169
3HAC085699-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
4 Maintenance
4.4.8 Replacing the SMB battery
Continued
Summary of Contents for IRB 6730
Page 1: ...ROBOTICS Product manual IRB 6730 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 628: ...This page is intentionally left blank ...
Page 634: ...This page is intentionally left blank ...
Page 659: ......