08 COMMISSIONING
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
107/174
8.1
Overview
The following sections provide an overview of the commissioning process for your drive.
8.1.1
Required qualification
8.1.2
Commissioning procedure
8.1.3
Commissioning checklist
8.1.4
Customer assistance
8.1.5
Customer acceptance
Commissioning, parameter adjustments and functional tests of the drive must be
carried out only by commissioning personnel certified by ABB.
Information on the commissioning procedure and the start conditions for
commissioning can be obtained from ABB.
In order to ensure uncomplicated and speedy commissioning, it is important that
drive and associated equipment are ready for commissioning. Reviewing and
completing the items in the “8.2 Commissioning checklist” on page 108 before the
commissioning personnel arrive on site will help to achieve this.
During the commissioning period, the customer is requested to provide qualified
personnel for assistance, who are:
- Experienced with medium and low voltage equipment and with the local
safety regulations
- Familiar with the driven process
- Authorized to operate associated medium and low voltage equipment (eg, main
circuit breaker, other low and medium voltage switchgear)
- Authorized to operate the driven process for functional tests
When commissioning has been completed, the commissioning report is signed by
the responsible commissioning personnel and by the customer as a sign of
acceptance. A copy of the report and a copy of the actual parameter settings are
handed out to the customer.
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......