08 COMMISSIONING
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
109/174
8.2.3
Main circuit breaker (MCB) checklist
8.2.4
Motor checklist
8.2.5
Insulation tests checklist
8.2.6
Power supply checklist
8.2.7
Miscellaneous checklist
1.
Type of MCB selected as per the MCB specification from ABB
□
2.
High-voltage connections completed
□
3.
MCB ready to be tested with drive
□
4.
MCB protection relay settings tested
□
5.
Safety devices (eg, door locks) tested and in operation
□
1.
Motor installed, aligned and alignment protocol available
□
2.
Motor not coupled to driven load
□
3.
Ground connection completed
□
4.
Motor auxiliaries (eg, bearing lubrication) ready
□
5.
Control and monitoring signals connected
□
1.
All power cables to converter transformer, between drive and motor measured,
and measured values within the required limits
□
2.
Test report of the Megger insulation resistance test available
Important:
If the test is carried out by the commissioning engineer of the drive,
an additional day per drive motor combination needs to be reserved. After the
test, the feeder cables can be connected, except at the drive end. The test must
comply with the specification.
□
1.
Medium voltage available for start-up of drive
□
2.
Low voltage auxiliary power available for start-up of drive
□
1.
Sufficient number and correct type of spare parts available
□
2.
Air conditioning of drive room ready for load run of drive
□
3.
Optional equipment ready
□
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......