03 POWER ELECTRONICS AND CABINET FEATURES
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
51/174
3.4.12.3
External cooling for braking resistors
A digital output and a digital input can be used to control and monitor an external cooling fan
or pump for the braking resistors.
3.4.12.4
Braking chopper ratings
The maximum braking power is limited to 60% of the nominal power of the ACS1000 and must
not be greater than 2.5 MW (Tab. 2-1).
The relation between maximum braking energy (E
brake max
) and maximum chopper braking
power (P
chopper max
) is as follows:
After a braking period of 30 s with maximum braking power (2.5 MW), a cooling time of one
hour is required. If two braking sequences of 30 s are necessary within an hour, the maximum
braking power has to be reduced to 50% of the maximum possible braking power.
Table 3-1: Braking ratings
ACS1000
Braking chopper
Type
Max. DC-link
voltage (V)
Max. braking power
(MW)
Max. braking
power (MW)
Max. braking
energy (MW)
ACS1012-A1
ACS 1013-A1
ACS 1014-A1
4200
6000
7270
0.426
0.426
0.426
2500
75
ACS1012-A2
ACS 1013-A2
ACS 1014-A2
4200
6000
7270
0.672
0.672
0.840
2500
75
ACS1012-A3
ACS 1013-A3
ACS 1014-A3
4200
6000
7270
0.960
1.080
0.960
2500
75
ACS1012-W1
ACS 1013-W1
ACS 1014-W1
4200
6000
7270
1.350
1.500
1.350
2500
75
ACS1012-W2
ACS 1013-W2
ACS 1014-W2
4200
6000
7270
1.680
2.130
2.130
2500
75
ACS 1013-W3
ACS 1014-W3
6000
7270
2.500
2.500
2500
75
E
brake max
MWs
P
chopper max
MW
30 sec
=
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......