11 PREVENTIVE AND CORRECTIVE MAINTENANCE
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
152/174
11.1
General information
During the warranty period of the drive, all maintenance must be
performed exclusively by ABB service personnel. After the warranty
period, maintenance must only be performed by certified personnel.
11.1.1
Required qualification
11.1.2
Maintenance schedule
Perform all maintenance tasks according to the maintenance schedule and the applicable
service instructions, on time and at the intervals stated in the "ACS1000 preventive
maintenance schedule" [1].
11.1.3
Logbook
ABB recommends that you keep track of all troubleshooting and maintenance work in a
logbook including:
- Date and time
- Detailed description
11.1.4
Spare parts
To ensure safe and reliable operation, use only spare parts recommended and
approved by ABB.
To maintain safe and reliable operation of the drive, ABB recommends taking out a
service contract with the ABB service organization.
For information on types and identification codes, see “Appendix E - Parts list”.
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......