04 CONTROL SYSTEM
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
- PC-based service tools comprising:
• DriveWare® software tools: commissioning and maintenance tools, ie, DriveWindow and
DriveDebug, and DriveOPC for data transfer between ABB drives and Windows®-based
applications.
• NETA-21 with ABB Ability monitoring contract (optional): monitoring and diagnostics
tool that allows access to the drive from any location in the world via a secure
Internet connection.
4.2.2.6
Control modes
The drive provides the following control modes:
-
Speed control mode
: Default control mode of the drive. The control mode can be used for
applications where constant speed is required, such as pumps, fans and conveyors.
-
Torque control mode
: used for processes that require torque control (eg, mixers and slave
drives). The torque reference comes from a process control system or a control panel.
-
PID control mode
: controls the process variable (eg, pressure, level or flow) by adjusting the
speed of the motor accordingly.
Figure 4-5: PID control mode
Application examples:
• Booster pumps of municipal water supply systems
• Automatic level control of water reservoirs
• Booster pumps of district heating systems
• Speed control of different types of material handling systems where the material flow
has to be regulated.
(1) Reference value
(2) Level transducer
(3) Actual value
(4) Pump
1
2
3
4
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......