08 COMMISSIONING
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
108/174
8.2
Commissioning checklist
This checklist is designed to help you prepare the drive and associated equipment
for commissioning.
8.2.1
Mechanical installation checklist
8.2.2
Electrical installation checklist
1.
Drive installed according to the instructions in this user manual
(3BHS206977 E01 Rev H).
□
2.
Drive securely fastened to the floor (if applicable)
□
3.
Fan units installed
□
4.
Visual inspection:
- No badly affixed or damaged components
- No foreign objects inside cabinet
- No dirt, dust and humidity inside cabinet
□
1.
Types and cross sections of control cables suitable for the signal type and
signal level
□
2.
Types and cross sections of power cables selected according to the instructions
in the power cable specification.
□
3.
Pulse encoder connected according to the relevant manual (only applicable for
drives with pulse encoder interface)
□
4.
Cable entry prepared according to the instructions in this user manual
(3BHS206977 E01 Rev H).
□
5.
All control cable screens and conductors are connected according to the
instructions of the user manual, appropriately labeled, and the customer-side
connections are completed
□
6.
Equipotential bonding conductor of drive securely connected at both ends
□
7.
Supply and motor cables not connected at both ends (cables and drive must be
insulation resistance tested (Megger test before connection)
□
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......