ZXR10 8900 Series Hardware Installation Manual
F
IGURE
60 F
LOATING
N
UT
I
NSTALLATION
1.
Corner rail
2.
Installation spring
3.
Floating nut
5. Two operators stand at right and left sides of the cabinet. The
one on left side support the middle bottom of the plug-in box
with his left hand, and hold the upper part of the plug-in box
with his right hand.
The one on right side support the middle bottom of the plug-in
box with his right hand and hold the upper part of the plug-in
box with his left hand. They uplift the plug-in box simultane-
ously.
6. Position the back of plug-in box on support rails of cabinet.
Holding the box firmly, the two operators must slowly move
the box inside the cabinet.
7. When 10cm of the plug-in box is inside the rails, one operator
can remove his hand at the bottom and push the box to posi-
tion. Hold the box before it is completely put into position.
8. The left side of plug-in box is fixed on the corner rails with 4
crown screws.
66
Confidential and Proprietary Information of ZTE CORPORATION
Содержание ZXR10 8900 Series
Страница 6: ......