About This Manual
Purpose
This manual provides procedures and guidelines that support the
operation of ZXR10 8900 Series (V2.8.02.C) 10 Gigabit Routing
Switch.
Intended
Audience
This manual is intended for engineers and technicians who perform
operation activities on ZXR10 8900 Series (V2.8.02.C) 10 Gigabit
Routing Switch.
What Is in This
Manual
This manual contains the following chapters:
T
ABLE
1 CHAPTER SUMMARY
Chapter
Summary
Chapter 1 Safety
Descriptions
This chapter describes the safety
instructions and signs
Chapter 2 Equipment
Installation
This chapter describes equipment
installation, commissioning flow and some
related parameters
Chapter 3 Installation
Preparation
This chapter describes external conditions
for equipment installation, instruments and
necessary technical documents to be used
in installation
Chapter 4 19” Standard
Cabinet Installation
This chapter introduces how to install
cabinets for ZXR10 8900 series routing
switches
Chapter 5 Master Device
Installation
This chapter describes how to install master
device
Chapter 6 Power Supply
Cables Installation
This chapter introduces power and
grounding cables of equipment and their
installation process
Chapter 7 External Cable
Installation
This chapter introduces installation of all
relevant external cables
Chapter 8 Hardware
Installation Inspection
When hardware installation is completed,
inspection must be performed on the
installation, to prepare system for
configuration and debugging.
Related
Documentation
The following documentation is related to this manual:
�
ZXR10 8900 Series (V2.8.02.C) 10 Gigabit Routing Switch
Hardware Installation Manual
�
ZXR10 8900 Series (V2.8.02.C) 10 Gigabit Routing Switch
Hardware Manual
�
ZXR10 8900 Series (V2.8.02.C) 10 Gigabit Routing Switch User
Manual (Basic Configuration Volume)
Confidential and Proprietary Information of ZTE CORPORATION
i
Содержание ZXR10 8900 Series
Страница 6: ......