Figures
Figure 1 ZXR10 8900 Installation Diagram ............................. 3
Figure 2 Side Elevation of ZXR10 8912 .................................. 4
Figure 3 Side Elevation of ZXR10 8908 .................................. 5
Figure 4 Side Elevation of ZXR10 8905 .................................. 5
Figure 5 Front Panel View of ZXR10 8902 .............................. 6
Figure 6 Equipment Installation Flow ..................................... 7
Figure 7 NOC Room Layout .................................................. 9
Figure 8 Adjustable Base Installation Flow ............................19
Figure 9 Adjustable Base: Model A.......................................20
Figure 10 Adjustable Base: Model B .....................................20
Figure 11 Adjustable Base: Model C .....................................20
Figure 12 Adjustable Base Installation Diagram .....................21
Figure 13 Adjustable Base Structure Diagram (Model B) .........21
Figure 14 Position of Single Cabinet Installation .....................22
Figure 15 Positions of Dual Cabinet Installation......................23
Figure 16 Adjustable Base Height Diagram............................25
Figure 17 Fixation of Adjustable Base ...................................26
Figure 18 Adjustable Shims ................................................27
Figure 19 Single Cabinet Base Installation Diagram ................27
Figure 20 Installation Flow of Base Directly on Floor ...............28
Figure 21 Position Single Cabinet Installation ........................29
Figure 22 Position Dual Cabinet Installation...........................29
Figure 23 Single Cabinet Expansion Bolt Installation Diagram...31
Figure 24 Installation Flow of Fixed Base ..............................32
Figure 25 19D8H20 Single Cabinet Drill Installation Diagram ...33
Figure 26 19D8H20 Dual Cabinet Drill Installation Diagram .....33
Figure 27 19D8H20 Single Cabinet Fixed Base Diagram ..........34
Figure 28 19D8H20 Single Cabinet Installation Diagram..........35
Figure 29 Installation of Base ..............................................36
Figure 30 Cabinet Installation Flow Diagram..........................39
Figure 31 Remove Truckles .................................................40
Figure 32 Footing Structure ................................................40
Figure 33 Fix Cabinet .........................................................41
Figure 34 Pressure Pad and Insulated Rubber Pad ..................41
Confidential and Proprietary Information of ZTE CORPORATION
97
Содержание ZXR10 8900 Series
Страница 6: ......