ZXR10 8900 Series Hardware Installation Manual
�
Power supply must be ready and capacity is sufficient for this
project.
�
Transmission equipment related to this project must have been
prepared.
�
Terminal device must be equipped with a dedicated terminal
console. The installation position of terminal console must be
correct and comply with equipment room layout requirements.
Required Tools
The following tools and instruments should be prepared well before
installation beginning.
�
Common tools
�
Marking tools:
long rolled tape, ruler (1m), marking pen
and scribe.
�
Concrete drilling tools:
hydraulic pressure percussion
drill, percussion drill bit and vacuum cleaner.
�
Fastening tools:
straight screwdriver (M3~M6), cross
screwdriver (M3~M6),
socket wrench (M6~M19) and
double offset spanner (M6~M19).
�
Measurement tools:
industrial horizontal ruler, rolled
tape, ruler and angle square.
�
Auxiliary tools:
Brush, nippers, paper knife, bellows,
electric iron, solder, ladder and forklift.
�
Fitting tools:
Sharp-nose pliers, diagonal pliers, vices,
hand-held electric drill, file, handsaw, crowbar, crowbar and
rubber hammer.
�
Instruments
Multimeter and 500V megohmmeter (used in insulation resis-
tance measurement)
�
Special tools
�
Optical multimeter, optical connector and tail fiber
�
Coaxial trunk self-loop cable
�
Coaxial cable installation tool
�
Earth resistance tester
�
Antistatic wrist strap
�
Cramping pincers
�
Cable winding gun
�
Crimping pliers
14
Confidential and Proprietary Information of ZTE CORPORATION
Содержание ZXR10 8900 Series
Страница 6: ......