ZXR10 8900 Series Hardware Installation Manual
F
IGURE
57 I
NSTALLATION OF
A
LL
T
OP
P
ANEL AND
T
OP
I
NSIDE
P
ANEL
ON
D
UAL
C
ABINET
Result:
Top panel and top inside panel have been installed.
Installing Power Supply Cable and
Grounding Cable
DC distribution cabinet provides power supply of -48V for ZXR10
8900 cabinet. Set-top connector module is installed on the top
of cabinet, which distributes power supply only. When the power
supply is required filtering, install two filters to replace connector
module for providing 2 way -48V power supply.
The connection between ZXR10 8900 cabinet and DC distribution
cabinet with connector module is shown in
Figure 58
.
60
Confidential and Proprietary Information of ZTE CORPORATION
Содержание ZXR10 8900 Series
Страница 6: ......