ZXR10 8900 Series Hardware Installation Manual
T
ABLE
7 I
NSTALLING
T
HE
B
ASE
D
IRECTLY
M
ARKING
S
IZE
Cabinet Name
A
B
C
D
19D6H20
Cabinet
600
496
L2+52
L1+40
19D8H20
Cabinet
19D8H20EMC
Cabinet
19D8H20EMC
Standard cabinet
800
696
L2+52
L1+40
19D10H20
Cabinet
19D10H20
Alternate server
Cabinet
19D10H20 Direct
server Cabinet
100
696
L2+152
L1+40
L1 is the distance from side gate and to the wall of cabinet
room, L1≥900mm.
L2 is the distance from front gate to the wall of cabinet room,
L2≥1500mm.
Note:
Verify measurement after marking of all installation holes to
avoid mistake and make sure that all measurements are cor-
rect.
2. Drilling
Drill φ14 at the expansion bolt hole marked on the floor with
a depth of 90 mm.
Make sure drill is perpendicular to floor when drilling with per-
cussion drill (or hammer). Hold handle tightly and vertically to
avoid sway, otherwise the floor will be damaged and hole will
be enlarged and inclined.
When floor is too slip to position drill bit, cut a dent at the
perforation position with punch first to help locating drill bit.
Use a vacuum cleaner to remove the dust after drilling.
3. Expansion bolt installation
Before installation, clean up dust inside and outside holes with
a vacuum cleaner.
Remove washer and nut from expansion bolt (M12×80), and
put expansion bolt and expansion tube into hole. Hammer ex-
pansion bolt using a rubber hammer until full expansion tube
of the expansion bolt enters into floor.
The installation of single cabinet expansion bolt is shown in
Figure 23
.