ZXR10 8900 Series Hardware Installation Manual
Figure 35 The clearance between Panel Wood and Floor ..........42
Figure 36 Cabinet Base is Installed on Floor Directly...............43
Figure 37 Remove Truckles .................................................44
Figure 38 Footing Structure ................................................45
Figure 39 Fix Cabinet by Pressure Plate ................................46
Figure 40 Remove Truckles .................................................47
Figure 41 Fix the Cabinet by Bolt .........................................48
Figure 42 Remove Screw of Angle Support ............................49
Figure 43 Remove the Angle Support ...................................49
Figure 44 Reinstallation the Angle Support ............................50
Figure 45 Connection Between Two Near Cabinets..................50
Figure 46 Door Installation Diagram .....................................52
Figure 47 Positions of Dustproof Plug-in Box..........................53
Figure 48 Outstructure Dustproof Plug-in Box Diagram ...........54
Figure 49 Simple Dustproof Meshes .....................................54
Figure 50 Plastic Dustproof .................................................55
Figure 51 Fix Front and Back Panel Wood..............................56
Figure 52 Installation of Front and Back Panel Wood Diagram...56
Figure 53 Fix Side Panel Wood Diagram ................................57
Figure 54 Installation of Single Cabinet Panel Wood Diagram ...57
Figure 55 Top Panel Installation Diagram ..............................58
Figure 56 Top Inside Panel Installation Diagram .....................59
Figure 57 Installation of All Top Panel and Top Inside Panel
on Dual Cabinet.................................................60
Figure 58 DC Distribution Cabinet Connecting with ZXR10
8900 (with connector module).............................61
Figure 59 DC Distribution Cabinet Connecting with ZXR10
8900 (with filter) ...............................................62
Figure 60 Floating Nut Installation .......................................66
Figure 61 Installation of Subrack .........................................67
Figure 62 Card Structure ....................................................68
Figure 63 Plugging Card Step 2 ...........................................69
Figure 64 Plugging Card Step 3 ...........................................69
Figure 65 Plugging Card Step 5 ...........................................70
Figure 66 Plugging Power Module Step 1 (ZXR10 8908) ..........71
Figure 67 Plugging Power Module Step 2 (ZXR10 8908) ..........72
Figure 68 Plugging Power Module Step 3 (ZXR10 8908) ..........72
Figure 69 Fake Power Supply Module....................................73
Figure 70 Install and Remove Fake Power Supply Module ........74
Figure 71 Plugging Power Module of ZXR10 8902 Step 1 .........75
98
Confidential and Proprietary Information of ZTE CORPORATION
Содержание ZXR10 8900 Series
Страница 6: ......