Chapter 4 19” Standard Cabinet Installation
If floor is not smooth, use shims provided by ZTE, the shims are
of 1mm and 2mm thick.
After installing the cabinet, inspect the NOC room environment
and cabinet. Clear the installation garbage and sundries from NOC
room. Sort and count the installation tool and instrument. If any
problem occurs during the installation, report it to the related staff
and department.
Result:
Fixed base has been installed.
Cabinet Installation
Cabinet Installation Requirements
Cabinet installation has the following requirements.
�
The cabinet must be vertically installed. Installed horizontality
and verticality deviation must not exceed 3mm.
�
The layout of cabinet must comply with project design require-
ments. Cabinets installed by side of the passage way must be
aligned straight with deviation less than 5mm. The adjacent
cabinets must be against each other. The row of cabinets must
be in the same plane.
�
The fastening screws must be tightened. The protrusion of the
nuts must be identical.
�
No component must be loose or damaged in cabinet. No paint
coating must be peeling off or damaged (make up the paints
where necessary). All the labels must be complete and clear.
�
The installed cabinet must be shockproof and reinforced. When
necessary, cabinet can be fixed on floor with bolts.
Cabinet Installation Preparation
Prepare necessary instruments and project design material and
installation guide material before cabinet base installation.
To design material of project installation, use the following Instru-
ments and material.
�
Engineering Design and Installation Drawing
�
Tools
�
Torque wrench
It fastens pressure plate and screws.
�
level bar
It measures the horizontality of cabinet.
Confidential and Proprietary Information of ZTE CORPORATION