![York YHAU-CGH Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/york/yhau-cgh/yhau-cgh_installation-operation-and-maintenance_912720079.webp)
FORM 155.32-ICOM2.EN.UL
SECTION 4 - TECHNICAL DATA
ISSUE DATE:1/10/2018
JOHNSON CONTROLS
79
Table 25 -
Write Command
USER-CREATED
The diagrams and tables that follow detail some of the work that must be performed by the
customer to ensure that the communication systems work properly.
Figure 35 -
Connection Detail For Sub 9 PiN
Table 26 -
Scope of Delivery of Upper Communication System
Table 27 -
Cable Diagram (RS-422/RS485)
ITEM
ADDRESS
CONTENT
1
Chiller-heater operation signal
02001
ON at CHILLER-HEATER OPERATION, PULSE SIGNAL
2
Chiller-heater stop signal
02002
ON at CHILLER-HEATER STOP, PULSE SIGNAL
3
Set point
00203
0050~1000 unit, 1 unit=0.1°F (0.1°C)
ITEM
CUSTOMER JCI
REMARKS
Control panel with upper
communication function
X
Communication protocol: Modbus RTU
Wiring work for Modbus
RTU communication
X
Apply RS485 communication cable, see
.
Communication program
for central monitoring
unit
X
For the details of the communication protocol, path
type, function code, communication data address,
and so on.
PIN CONNECTION
PIN. NO.
RS-422/RS-485
SIGNAL NAME DIRECTION
MEANING
1
RDA
Input
Receive Data A (+)
2
RDB
Input
Receive Data B (-)
3
SDA
Output
Send Data A (+)
4
ERA
Output
Data Terminal Ready A (+)
5
SG
Signal Ground
6
CSB
Input
Send Possible B (-)
7
SDB
Output
Send Data B (-)
8
CSA
Input
Send Possible A (+)
9
ERB
Output
Data Terminal Ready B (-)
Shell
FG
Frame Ground (Common with SG)
LD20597b
Serial Interface (COM2)
Connect User Created Table
5
1
9
6
LD20598
Содержание YHAU-CGH
Страница 14: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 14 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 38 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 55: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 JOHNSON CONTROLS 55 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 57: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 57 LD27463...
Страница 59: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 59 LD27465...
Страница 61: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 61 LD27471...
Страница 63: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 63...
Страница 65: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 65 LD27477...
Страница 67: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 67 LD27479...
Страница 69: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 69 LD27475...
Страница 160: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 160 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 170 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 172 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 181: ...FORM 155 32 ICOM2 EN UL APPENDIX 1 CHECKLIST ISSUE DATE 1 10 2018 JOHNSON CONTROLS 181 NOTES...