SECTION 7 – MAINTENANCE
FORM 155.32-ICOM2.EN.UL
ISSUE DATE:1/10/2018
146
JOHNSON CONTROLS
TREATMENT FOR LONG STOPPAGE OF THE ABSORPTION
CHILLER-HEATER
If the absorption chiller-heater is stopped for several days, bacteria in the water or in the
tubes may grow. The bacteria can corrode the tubes. When stopping the chiller-heater for
more than 15 days, drain the water from the absorber, condenser, and evaporator through
the drain valve at the bottom of the waterbox.
CHEMICAL TREATMENT
Corrosion inhibitors are attracted chemically to the metal surfaces when the latter are
corroded or they form inert protective compounds over the metal surfaces. For effective
use of the corrosion inhibitors, types of inhibitors must be selected and their concentration
must be determined according to the conditions of the chiller-heater system. In those
conditions, water quality, temperature, flow speed, metals used, existence of crevices and
deposits and type of water system must be included. For the complete corrosion preventive
measure, consult a water treatment company.
FLOW SPEED IN TUBES
Since the water flow speed in the tubes is closely related to any existing corrosion, do not
increase the water supply rate more than recommended. If the flow speed reaches 3.5 to 4
meters per second, the tubes may erode. When changing the flow rate, contact your local
Johnson Controls Service Center.
If the water supply rate is adjusted at the inlet side of the heat exchanger (evaporator,
condenser, and absorber), the eddy current at the inlet may corrode the tube.
Be sure to control the flow rate on the outlet side.
The eddy current caused by foreign matter in the heat exchanger is also a factor in
corrosion. Be sure to install a strainer on the inlet side of the heat exchanger and clean the
strainer.
Содержание YHAU-CGH
Страница 14: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 14 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 38 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 55: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 JOHNSON CONTROLS 55 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 57: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 57 LD27463...
Страница 59: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 59 LD27465...
Страница 61: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 61 LD27471...
Страница 63: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 63...
Страница 65: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 65 LD27477...
Страница 67: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 67 LD27479...
Страница 69: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 69 LD27475...
Страница 160: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 160 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 170 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 172 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 181: ...FORM 155 32 ICOM2 EN UL APPENDIX 1 CHECKLIST ISSUE DATE 1 10 2018 JOHNSON CONTROLS 181 NOTES...