FORM 155.32-ICOM2.EN.UL
SECTION 3 - HANDLING, STORAGE, INSTALLATION AND REASSEMBLY
ISSUE DATE:1/10/2018
JOHNSON CONTROLS
33
Figure 12 -
Fuel Gas Piping System
The oil return pipe should be connected to the vapor phase part above the service tank, and no shut off valve should be located
on this oil return line. In addition, to prevent aeration into the oil supply (delivery) pipe, the oil return pipe should be set apart
from the delivery line and a baffle plate should be installed on the return pipe. A flow meter should also be installed on the oil
supply (delivery) pipe to the oil service tank.
The scope of supply of delivery is inside the parameters of the unit shown in
Installation and piping are
outside the scope of supply and should be supplied and prepared by the contractor or customer. See
o
plan the fuel supply piping from oil storage tank to chiller-heater.
Figure 13 -
Oil System
NOTE:
• Install an oil gauge near the chiller-heater.
• The oil service tank should be installed on the same floor and be level with the chiller-heater.
LD27457
LEAK TEST PORT
)OZ_-GY
9IUVKU
L9[VVR_
,RU]
3KZKX
<+4:'98+7;/8+*(?)5*+
68+99:'6
6/25:(;84+8
3'/4(;84+8
'9)259+:53'4/,52*
-'9'96599/(2+
狣狦5,'4/4).
68+99:'63'?
(+/4:+-8'2:5
-'9<'2<+
68+99:'6=62;-3'?
'295(+6'8:5,4/662+
5835:58/@+*-'9
<'2<+
)544+):/543'?'295
(+3'*+:5:'66/4-/4
3'/4-'9)5)1
LD
27375
Blower
Electric Butterfly Valve
Electrode
for Ignition
Nozzle Tip
Flame
Detector
Protect Relay
(Burner Controller)
Check
Valve
Fuel
Shut-Off
Valve
Oil Regulating Valve
Flexible Tube
Flexible Tube
Pre-Heater
Pressure
Gauge
(Return)
Fuel
Shut-Off
Valve
Fuel
Shut-Off
Valve
Pressure
Gauge
(Discharge)
Fuel
Pump Oil
Oil Filter
Oil Filter
Oil Storage Tank
Oil Feed Pump
Oil Filter
Flow Meter
Baffle Plate
Air Vent
Pipe
Oil Level
Alarm Device
Oil Level
Control Device
Oil Service
Tank
Содержание YHAU-CGH
Страница 14: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 14 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 38 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 55: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 JOHNSON CONTROLS 55 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 57: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 57 LD27463...
Страница 59: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 59 LD27465...
Страница 61: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 61 LD27471...
Страница 63: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 63...
Страница 65: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 65 LD27477...
Страница 67: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 67 LD27479...
Страница 69: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 69 LD27475...
Страница 160: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 160 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 170 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 172 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 181: ...FORM 155 32 ICOM2 EN UL APPENDIX 1 CHECKLIST ISSUE DATE 1 10 2018 JOHNSON CONTROLS 181 NOTES...