SECTION 3 - HANDLING, STORAGE, INSTALLATION
AND REASSEMBLY
This chiller-heater is for air conditioning or a cooling manufacturing process. Transport,
store, and use this chiller-heater under the following conditions:
• Installation location: Indoor, non-explosion area
• Ambient temperature: 50~104 °F (10 ~ 40°C)
• Humidity: 10 ~ 90% (RH%)
• Altitude: 3333 Ft (1000 m) or lower
If the plant room will ever drop below 50 °F (10°C), you must install the cold ambient option.
INSPECTION
The unit must be inspected prior to customer use by a Johnson Controls Service
representative. All damage or possible damage must be reported to the transportation
company. For further details, see
.
INSPECTION WINDOW
The inspection window of the exhaust gas duct or chimney must not be turned to the aisle
side in case the exhaust gas duct or chimney has a problem from a unit failure or burner
combustion deterioration. If it must be turned to the aisle side, install a guard fence around
the inspection window.
DANGER: Rigging and lifting should only be done by a professional rigger in accor-
dance with a written plan. The most appropriate rigging and lifting method will depend
on job specific factors, such as the equipment available and site needs. Therefore, a
professional rigger must determine the rigging and lifting method to be used. It is be-
yond the scope of this manual to specify rigging and lifting details.
LD18119
Содержание YHAU-CGH
Страница 14: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 14 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 38 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 55: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 JOHNSON CONTROLS 55 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 57: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 57 LD27463...
Страница 59: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 59 LD27465...
Страница 61: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 61 LD27471...
Страница 63: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 63...
Страница 65: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 65 LD27477...
Страница 67: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 67 LD27479...
Страница 69: ...FORM 155 32 ICOM2 EN UL SECTION 4 TECHNICAL DATA ISSUE DATE 1 10 2018 JOHNSON CONTROLS 69 LD27475...
Страница 160: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 160 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 170: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 170 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...FORM 155 32 ICOM2 EN UL ISSUE DATE 1 10 2018 172 JOHNSON CONTROLS THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 181: ...FORM 155 32 ICOM2 EN UL APPENDIX 1 CHECKLIST ISSUE DATE 1 10 2018 JOHNSON CONTROLS 181 NOTES...