IM 11G06A01-02EN
4-1
4. OPERATION
1st Edition : Oct. 27, 2023-00
4. OPERATION
Check that the pipes are correctly connected to the gas sampling port and drain port. Check that
the analyzer is correctly wired as specified.
4.1
Warm-up operation and regular operation
Procedure
(1) Turn ON the power.
The IR810G turns on when the power supply is connected.
The measurement screen appears on the front display panel.
(2) Warm-up operation for about 4 hours
(3) See 5. SCREENS to make the necessary settings.
(4) Perform zero/span calibration after the warm-up operation (see 5.4 Calibration and
(5) Introduce the measurement gas into the IR800G/IR810G and start measurement.