SPECIAL TOOLS
1-17
Valve spring compressor
90890-04200
Valve spring compressor
YM-04019
Valve spring compressor attachment
90890-04108
Valve spring compressor adapter 22 mm
YM-04108
Valve guide remover (ø5)
90890-04097
Valve guide remover (5.0 mm)
YM-04097
Valve guide installer (ø5)
90890-04098
Valve guide installer (5.0 mm)
YM-04098
Valve guide reamer (ø5)
90890-04099
Valve guide reamer (5.0 mm)
YM-04099
Valve guide remover (ø4.5)
90890-04116
Valve guide remover (4.5 mm)
YM-04116
Valve guide installer (ø4.5)
90890-04117
Valve guide installer (4.5 mm)
YM-04117
Valve guide reamer (ø4.5)
90890-04118
Valve guide reamer (4.5 mm)
YM-04118
Tool name/Tool No.
Illustration
Reference
pages
Содержание YZ 2023 Series
Страница 6: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Страница 10: ......
Страница 44: ...MOTORCYCLE CARE AND STORAGE 1 32...
Страница 61: ...TIGHTENING TORQUES 2 16...
Страница 62: ...CABLE ROUTING DIAGRAM 2 17 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view...
Страница 64: ...CABLE ROUTING DIAGRAM 2 19 Frame and engine right side view...
Страница 66: ...CABLE ROUTING DIAGRAM 2 21 Handlebar front view...
Страница 68: ...CABLE ROUTING DIAGRAM 2 23 Frame and engine top view...
Страница 70: ...CABLE ROUTING DIAGRAM 2 25 Frame and battery top view...
Страница 72: ...CABLE ROUTING DIAGRAM 2 27 Rear brake right side view...
Страница 74: ...CABLE ROUTING DIAGRAM 2 29...
Страница 112: ...ELECTRICAL SYSTEM 3 36...
Страница 148: ...REAR BRAKE 4 34 system Refer to BLEEDING THE HYDRAULIC BRAKE SYSTEM on page 3 25...
Страница 154: ...HANDLEBAR 4 40 Throttle grip free play 3 0 6 0 mm 0 12 0 24 in...
Страница 187: ...INSTALLING THE TRANSMISSION 5 74...
Страница 190: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 5 3 1 Oil filter element 2 Oil pump...
Страница 191: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 5 4 1 Intake camshaft 2 Exhaust camshaft...
Страница 192: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 5 5 1 Camshaft 2 Oil pressure check bolt 3 Oil pump 4 Oil filter element...
Страница 245: ...SHIFT SHAFT 5 58 TIP Align the punch mark a on the shift shaft with the punch mark b in the shift pedal 1 1 2 2 a b...
Страница 251: ...OIL PUMP 5 64 A Primary drive gear side B Crankcase cover side 5 7 mm 0 02 0 28 in 5 c d 6 8 b 8 6 7 E...
Страница 264: ...TRANSMISSION 5 77...
Страница 274: ...WATER PUMP 6 9...
Страница 284: ...THROTTLE BODY 7 9...
Страница 286: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 58 CHECKING THE GEAR POSITION SWITCH 8 58 CHECKING THE INJECTOR 8 59...
Страница 287: ......
Страница 288: ...IGNITION SYSTEM 8 1 EAM20142 IGNITION SYSTEM EAM30277 CIRCUIT DIAGRAM...
Страница 292: ...ELECTRIC STARTING SYSTEM 8 5 EAM20143 ELECTRIC STARTING SYSTEM EAM30279 CIRCUIT DIAGRAM...
Страница 296: ...CHARGING SYSTEM 8 9 EAM20144 CHARGING SYSTEM EAM30282 CIRCUIT DIAGRAM...
Страница 299: ...CHARGING SYSTEM 8 12...
Страница 300: ...SIGNALING SYSTEM 8 13 EAM20154 SIGNALING SYSTEM EAM30348 CIRCUIT DIAGRAM...
Страница 304: ...FUEL INJECTION SYSTEM 8 17 EAM20145 FUEL INJECTION SYSTEM EAM30284 CIRCUIT DIAGRAM...
Страница 329: ...FUEL INJECTION SYSTEM 8 42...
Страница 330: ...FUEL PUMP SYSTEM 8 43 EAM20146 FUEL PUMP SYSTEM EAM30287 CIRCUIT DIAGRAM...
Страница 362: ...SELF DIAGNOSTIC FUNCTION AND DIAGNOSTIC CODE TABLE 9 15...
Страница 372: ...CHASSIS 10 9...
Страница 374: ......
Страница 376: ......
Страница 377: ...YZ250FXP 2023 WIRING DIAGRAM BAJ 2819U 13_WD indd 1 2022 04 01 9 58 37...
Страница 378: ...YZ250FXP 2023 WIRING DIAGRAM BAJ 2819U 13_WD indd 2 2022 04 01 9 58 37...