10-2
10
Engine oil filter (car-
tridge)
Replacement
F
F
F
F
/
U
U
U
U
Fuel filter (can be disas-
sembled)
Inspection or replace-
ment as necessary
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
Fuel line (High pressure)
Inspection
F
F
F
F
F
F
F
F
Fuel line (High pressure)
Inspection or replace-
ment as necessary
U
U
U
U
U
U
U
U
Fuel line (Low pressure)
Inspection
F
F
F
F
F
F
F
F
Fuel line (Low pressure)
Inspection or replace-
ment as necessary
U
U
U
U
U
U
U
U
Fuel pump
Inspection or replace-
ment as necessary
U
U
U
U
Fuel/engine oil leakage
Inspection
U
U
U
U
U
U
U
U
Gear oil
Replacement
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
Greasing points
Greasing
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
Impeller/water pump
housing
Inspection or replace-
ment as necessary
U
U
U
U
Impeller/water pump
housing
Replacement
U
U
U
U
OCV (Oil Control Valve)
filter
Replacement
U
U
U
U
Power trim and tilt unit
Inspection
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
Propeller/propeller
nut/cotter pin
Inspection or replace-
ment as necessary
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
PCV (Pressure Control
Valve)
Inspection or replace-
ment as necessary
U
U
U
U
Shift link/shift cable
Inspection, adjustment or
replacement as neces-
sary
U
U
U
U
U
U
U
U
Spark plug(s)
Inspection or replace-
ment as necessary
F
F
F
F
/
U
U
U
U
Spark plug caps/spark
plug wires
Inspection or replace-
ment as necessary
U
U
U
U
U
U
U
U
Water from the cooling
water pilot hole
Inspection
F
F
F
F
/
U
U
U
U
F
F
F
F
/
U
U
U
U
Throttle link/throttle
cable/throttle pick-up tim-
ing
Inspection, adjustment or
replacement as neces-
sary
U
U
U
U
U
U
U
U
Thermostat
Inspection or replace-
ment as necessary
U
U
U
U
Timing belt
Inspection or replace-
ment as necessary
U
U
U
U
Valve clearance
Inspection and adjust-
ment
U
U
U
U
Item
Actions
Initial
Every
See
page
20 hours
(3 months)
100 hours
(1 year)
300 hours
(3 years)
500 hours
(5 years)
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...