9-42
9
5.
Pass the PTT motor lead
a
through the
hole
b
in the clamp bracket (STBD).
6.
Connect the PTT motor leads
a
to the
battery terminals to extend the PTT
rams.
7.
Insert the shaft
6
, and then install the
circlips
7
.
8.
Connect the ground lead
8
.
9.
Fasten the PTT motor lead
a
and trim
sensor lead using the plastic ties
9
.
PTT unit bolt
5
:
42 N·m (4.2 kgf·m, 31.0 ft·lb)
Ram
PTT motor lead
Battery
terminal
Up
Sky blue (Sb)
Light green (Lg)
4
5
2
5
5
2
3
3
Lg
Sb
a
b
a
7
8
6
7
9
9
9
9
a
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...