3-8
3
5.
Apply sealant to the mounting holes and
secure the outboard motor using the
included mounting bolts
2
, small wash-
ers
3
, large washers
4
, and nuts
5
.
NOTICE:
Make sure that there is no
clearance between the surfaces of the
boat transom and the clamp brackets.
Otherwise, the clamp brackets or boat
transom may be damaged.
TIP:
The second hole from the top of each clamp
bracket is recommended for the upper
mounting bolt.
6.
Install the mounting bolts, and then
tighten the nuts firmly.
NOTICE:
Make
sure that the clamp brackets do not
bite into the boat transom.
7.
Tighten the locknuts firmly.
Outboard motor mounting height
4-stroke engines are heavier than 2-stroke
engines of the same horsepower. Therefore,
if a 2-stroke outboard motor is replaced with
a 4-stroke outboard motor, the boat will
become “stern heavy.” Also, the water line
will rise and become closer to the power unit.
If the water line is too close to the power
head, poor engine performance could result,
and water could enter the cylinders and dam-
age the engine.
When mounting a 4-stroke outboard motor to
a boat, make sure that the mounting height
between the water surface and the clamp
bracket seating point is not less than the
specified minimum mounting height
a
. Mea-
sure the mounting height when the boat is
moored and carrying the maximum load.
Boat transom
thickness (D)
Mounting bolt
65–75 mm
(2.56–2.95 in)
M12
×
130 mm
(5.12 in)
75–95 mm
(2.95–3.74 in)
M12
×
150 mm
(5.91 in)
2
3
3
4
5
D
5
2
3
3
4
5
2
3
3
4
Minimum mounting height
a
:
100 mm (3.9 in)
a
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...