5-30
5
F200B and FL200B:
F250G and FL250G:
4.
Check that the output voltages of APS 1
and APS 2 change continuously when
the remote control lever is operated.
5.
Turn the engine start switch to OFF.
6.
Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
7.
Disconnect the throttle cable joint from
the APS.
8.
Disconnect the APS coupler
e
.
9.
Measure the APS resistance when the
accelerator lever
a
is at the fully closed
position
f
and fully open position
g
.
È
Fully closed position
É
Fully open position
10. Connect the APS coupler.
11. Connect the throttle cable joint to the
APS.
12. Install the intake manifold (STBD). See
“Installing the intake manifold” (6-18).
Checking the APS circuit
1.
Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
2.
Disconnect the APS coupler
a
.
3.
Turn the engine start switch to ON, and
then measure the input voltage at the
APS coupler
a
.
APS output voltage (reference data):
Item
Fully closed
c
Fully
open
d
APS 1
0.550–0.850 V
Above 3.250 V
APS 2
0.400–1.000 V
APS output voltage (reference data):
Item
Fully closed
c
Fully
open
d
APS 1
0.500–0.850 V
4.950 V
APS 2
0.400–1.000 V
e
APS resistance at 20 °C (68 °F)
(reference data):
Item
Terminal
Fully
closed
f
Fully
open
g
APS 1
h
–
k
0.8 k
Ω
5.3 k
Ω
APS 2
m
–
n
a
a
g
f
È
É
h
k
m n
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...