7-97
POWR
Power unit
TIP:
• Install each thrust bearing with its grooves
t
facing outward.
• Fit the protrusion on each thrust bearing
into the slot in the crankcase.
11. Install new O-rings
C
and
D
and the
crankcase
E
onto the cylinder block, and
then tighten the crankcase bolts
F
and
G
to the specified torques in 2 stages
and in the order
1
,
2
, and so on.
12. Tighten the crankcase bolts
H
to the
specified torques in 2 stages and in the
order
G
,
H
, and so on.
TIP:
• Make sure that the oil seal
8
must be
installed before tightening the crankcase
bolts.
• In the 2nd tightening stage for the M8 bolts
F
and M10 bolts
G
, mark the bolts and the
crankcase
E
with identification marks
u
,
and then tighten the bolts 90° from the
marks on the crankcase.
• After tightening the crankcase bolts, make
sure that the crankshaft turns smoothly.
13. Install the piston
I
so that the mark
v
on the piston crown is facing toward the
flywheel magnet end of the crankshaft.
G
E
F
H
C
D
8
Crankcase bolt
F
1
–
8
(M8):
1st: 28 N·m (2.8 kgf·m, 20.7 ft·lb)
2nd: 90°
Crankcase bolt
G
9
–
F
(M10):
1st: 33 N·m (3.3 kgf·m, 24.3 ft·lb)
2nd: 90°
Crankcase bolt
H
G
–
S
(M8):
1st: 14 N·m (1.4 kgf·m, 10.3 ft·lb)
2nd: 28 N·m (2.8 kgf·m, 20.7 ft·lb)
PORT
UP
STBD
90
u
1
2
3
4
5
6
7
8
9
0
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
H
F
G
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...