5-49
ELEC
Electrical system
9.
Check the wiring harness for continuity.
TIP:
Make sure that there is continuity between
terminal 4 of the throttle body assembly wir-
ing harness extension coupler
a
and one of
the terminals of the fuse holder coupler
b
.
10. Connect the engine ECM coupler.
NOTICE:
Make sure that the rubber
seal is installed properly in the engine
ECM coupler.
11. Install the engine ECM, and then tighten
the engine ECM bolts to the specified
torque.
12. Install the engine ECM cover.
13. Connect the fuse holder coupler, and
then install the fuse holder.
14. Measure the vapor shut-off valve resis-
tance.
15. Remove the intake manifold (PORT).
See “Removing the intake manifold” (6-
17).
16. Remove the throttle body assembly. See
“Removing the throttle body assembly”
(6-23).
17. Remove the vapor shut-off valve from the
throttle body assembly.
18. Connect the special service tool
2
to the
vapor shut-off valve.
19. Apply the specified negative pressure to
the vapor shut-off valve.
20. Check that the vapor shut-off valve
opens and the negative pressure is
released when the battery leads are con-
nected to the vapor shut-off valve termi-
nals.
NOTICE:
Do not connect the
battery leads to the vapor shut-off
valve terminals for more than a few
seconds
.
Wiring harness continuity:
a
Terminal 4–
b
Terminals 1–10 and 16–22
a
Terminal 5–
c
Terminal 85
Engine ECM bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
c
9
10
22 21 20 19 18 17 16
8
7 6
5 4
3 2 1
c
b
a
85
4
5
Vapor shut-off valve resistance (reference
data):
Red/Yellow (R/Y)–Green/Black (G/B)
30.0–34.0
Ω
at 20 °C (68 °F)
G/B R/Y
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...