5-41
ELEC
Electrical system
5.
Apply positive pressure to the water
pressure sensor slowly, and then mea-
sure the output voltage at the specified
pressures.
6.
Turn the engine start switch to OFF, and
then disconnect the special service tool
and pressure pump.
7.
Install the water pressure sensor. See
steps 2 and 3 in “Installing the water
pressure sensor (optional)” (3-13).
8.
Remove the engine ECM, and then dis-
connect engine ECM couplers
b
and
c
.
9.
Check the wiring harness for continuity.
10. Connect the engine ECM couplers.
NOTICE:
Make sure that the rubber
seal is installed properly in each
engine ECM coupler.
11. Install the engine ECM, and then tighten
the engine ECM bolts to the specified
torque.
12. Connect the water pressure sensor cou-
pler.
13. Install the engine ECM cover.
Checking the speed sensor
(optional)
1.
Remove the engine ECM cover.
2.
Disconnect the speed sensor coupler
a
.
3.
Turn the engine start switch to ON, and
then measure the input voltage at the
speed sensor coupler.
Pressure pump
1
:
(commercially available)
Test harness (3 pins)
2
:
90890-06869
Water pressure sensor output voltage
(reference data):
Blue/Black (L/B)–Black (B)
2.5 V at 392.0 kPa
(3.92 kgf/cm
2
, 56.8 psi)
4.5 V at 784.0 kPa
(7.84 kgf/cm
2
, 113.7 psi)
2
2
1
B
B
G
G/W
O
L/B
c
b
Wiring harness continuity:
a
Terminal 1–
c
Terminal 48
a
Terminal 2–
b
Terminal 18
a
Terminal 3–
c
Terminal 42
Engine ECM bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
1
2
3
a
c
b
18
42
48
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...